Wuxi Ido Technology Co., Ltd.

Wuxi Ido Technology Co., Ltd.

Manufacturer from China
Verified Supplier
1 Years
Home / Products / Top Loading Washing Machine Drum Production Line /

Flexible Transmission Automatic Production Line for Top-Loading Washing Machine Drum

Contact Now
Wuxi Ido Technology Co., Ltd.
City:wuxi
Province/State:jiangsu
Country/Region:china
Contact Person:MsLuo
Contact Now

Flexible Transmission Automatic Production Line for Top-Loading Washing Machine Drum

Ask Latest Price
Video Channel
Model NO. :WM-02
Transmission Type :Flexible
Automatic Production Line :Assembly
Certification :ISO
Flexible Production :Intelligent Manufacturing
Rhythm :Flow Production Line
Production Scope :Parts Production Line
Transport Package :Wooden Cases, Vacuum Packing, Anti-Rust Oil
Trademark :IDO
Origin :China
Customization :Available
Automation :Automation
After-sales Service :Negotiable
Place of Origin :China
MOQ :1 set
Delivery Time :Peak Season Lead Time: 3-6 months, Off Season Lead Time: 1-3 months
Payment Terms :LC, T/T
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description
Top-loading Washing Machine Drum Assembly Line by Wuxi IDO Technology

Line Layout

Flexible Transmission Automatic Production Line for Top-Loading Washing Machine DrumNotes:
1. Technical cycle time: 15S.
2. Space: 12*3m.
3. Labor requirement: 7 persons.

Flexible Transmission Automatic Production Line for Top-Loading Washing Machine Drum

Machine list of the whole line

No. Machine name Q'ty Cycle-time Remark
1 Rolling machine 1 set 10S
2 lock-seaming machine 1 set 12S
3 Grooving machine 1 set 15S
4 Manual assembling & screwing table 1 set 15S Including 2 pneumatic screwing guns
5 Edge covering & curling machine 1 set 15S
6 Run-out check machine 1 set 15S

Machine Details

Flexible Transmission Automatic Production Line for Top-Loading Washing Machine Drum
-ST 1 Rolling Machine
Main actions:
1. It can be used to produce several variants.

2. The adjustment of rolling shape is achieved by adjusting the gap among the three rubber covered rollers.

ST2: V-bending and lock seaming machine
Main actions:

1. Manually carry out v-bending, then seaming.

2. It can be used to produce several variants through changing the corresponding seaming tool.

3. Tensile strength: 1800N/50mm
The overall frame of this machine is made of welded steel plates, and is powered by a water-cooled hydraulic station with an output pressure of 30T.
This machine adopts an integrated mold, the lower part is for V-bending, and the upper part is for lock-seaming.
During the V-bending process, it is necessary to manually grasp the blank with both hands.
The punches and matrixes of lock-seaming mould can be replaced quickly, which is convenient for later maintenance.
,
The control cabinet is fixed on the machine with foot switch.
Flexible Transmission Automatic Production Line for Top-Loading Washing Machine Drum
Flexible Transmission Automatic Production Line for Top-Loading Washing Machine Drum
ST3: Grooving Machine
Main actions:
1. The electrical integration design of the grooving machine facilitates the machine transfer. Use metal plate + meshes for protection (as shown in the picture).

2. Design two-hand pneumatic switches with grating protection. All safety doors are designed with mechanical locks.

3. Use SEW motor to drive the inner bracing modules.

4. The grooving assembly is driven by a servo motor.

5. Adjust the grooving position and depth through HMI.
ST4: Manual assembling & screwing table
1. Use air cylinder to press the drum wrapper and drum bottom tight.

2. Manual screwing: 2 persons at the same time

3. Equip 2 screwing guns.

4. It can be used to produces 3 models through changing the locating block.

5. The changeover can be done within 10 minutes.
Flexible Transmission Automatic Production Line for Top-Loading Washing Machine Drum
Flexible Transmission Automatic Production Line for Top-Loading Washing Machine Drum
ST5: Edge wrapping & curling machine
1. The electrical integration design of the grooving machine facilitates the machine transfer. Use metal plate + meshes for protection (as shown in the picture).
2. Design two-hand pneumatic switches with grating protection. All safety doors are designed with mechanical locks.
3. Use SEW motor to drive the inner bracing modules.
4. The curling and edge wrapping assembly is driven by a servo motor.
5. Adjust the curling and edge wrapping positions through HMI.
ST6: Run-out measuring machine

1. Manually fix the drum on the test jig and place the test ring.
2. The drum rotates slowly driven by the servo motor.
3. Using digital display dial gauge feedback run-out data, run-out data ≤ 2.0.
4. For different drums, it is necessary to make inspection jigs and rings of different specifications.
Flexible Transmission Automatic Production Line for Top-Loading Washing Machine Drum

Commercial Components

No. Name Brand
1 Servo motor Mitsubishi or Siemens
2 Gear motor SEW or Siemens
3 3-phase asynchronous motor Siemens
4 Touch screen Mitsubishi or Siemens
5 PLC Mitsubishi or Siemens
6 Pneumatic component SMC or FESTO
7 Hydraulic component REXROTH
8 Adhesive dispensing component Graco or Nordson
9 Inductive switch Omron or SICK or Keyence
10 Guide rail and sliders HIWIN or THK
11 Bearings NSK
12 Optical grating SICK
13 Robot ABB or KUKA
Flexible Transmission Automatic Production Line for Top-Loading Washing Machine DrumFlexible Transmission Automatic Production Line for Top-Loading Washing Machine DrumFlexible Transmission Automatic Production Line for Top-Loading Washing Machine Drum


















































Inquiry Cart 0